filtered by: tags.tag NÖVOG Filter by category Filter by tag
With the start of the Wachaubahn season on 15 March 2025, NÖVOG's new operations control centre in Spitz an der Donau will go into operation.
The Mariazellerbahn Himmelstreppe fleet is complete again. ET6, the second of the two NÖVOG EMUs that were damaged in the heavy accident on 26 June 2018, has returned from Switzerland.