posted on 14th Mar 2024 10:08
On 11 March 2024, one of the new firefighting and rescue trains for ÖBB was delivered to Velim. In this case, it is the second of a total of 18 of these three-car triple-power units with a maximum speed of 160 km/h, which are manufactured by Stadler.